How many units does a street event need?
The count is set by peak attendance and the ratio the permit uses. City guidance works to about one toilet per 50 people at peak, and the parks department applies its own figure, so the number is confirmed with the permitting office before the plan is signed.
Plan against peak attendance, not the total for the day. A parade that draws a large crowd for twenty minutes needs its units at the start of that window, while a festival with a similar crowd across four hours needs the count sustained through the afternoon. Ask the organizer for the peak estimate in writing.
For events over 250 attendees, the parks form asks for two toilets per 500 attendees and at least one ADA unit. Where parkland is involved, check that form before assuming the city guidance settles the number.
Where do units go on a sidewalk?
On the curb side, outside the five-foot path, with the path kept clear and marked on the plan.
The five feet is a continuous measure along the whole route, so a single unit or a sign that cuts into it breaks the path. Plan drawings and real sidewalks often differ at curb ramps and utility boxes, so the crew checks the width on the ground.
A unit on a slope can tip, and a unit that blocks a driveway or curb ramp draws complaints. The 311 system takes reports of a unit blocking a sidewalk, and the city's response is to remove it.
What is the notice period for a closure?
A closed sidewalk, bike lane or alley needs notice to 311 at least three days before. Some city pages say three business days, so the current rule is confirmed before the date is set.
The notice is separate from the event permit, and the city's right-of-way standards require pedestrian routes to stay accessible during the work. A sidewalk should not be closed for more than 14 days without approval from the right-of-way division.
For work on private property that closes a sidewalk or driveway, a Temporary Use of Right of Way permit is required, and the approved permit and traffic-control plan stay on site throughout.
What moves the price for a street event?
The unit count, the number of clusters, the length of the closure, how often the units are serviced and the truck access on a closed street. The price is explained and approved before work starts.
A closed street limits where a truck can stop, and a unit set down on a busy block has to be carried into place. Long closures and several clusters add service runs. The count and the access move the price the most, so ask about those first.
The provider confirms the price for the site before delivery, and you approve it before any work starts. Ask for the breakdown by cluster. No price figure is given on this page.
What does a site plan need to show?
Each unit and its cluster, the accessible units and their route, the five-foot path, the entrances and the servicing times.
The plan is what the permit reviewers and the crew both work from. It shows each unit's location and type, the accessible units and the route to them, and the paths that must stay clear. Mark the entrances, stages and any curb cut, because those are where a unit is most often placed by mistake.
Servicing times belong on the plan too, along with the shade and water supply for handwashing stations, since summer heat raises both servicing and handwashing demand.