Call to reach a local providerAustin, TX
Call (888) 351-0294
Highland, TX · 78752

Portable toilet rental for Highland campus phases and apartment renovations

Call to reach a local provider across Highland. Call for a clear price before any work starts.

  • Standard units, ADA units and restroom trailers
  • Construction sites, festivals and private events
  • Delivery, servicing and pickup scheduled around your dates

Get a fast quote

Fastest: call (888) 351-0294. Or send this and we call you back.

Highland, TX

Local service in Highland

portable restroom rental in Highland

Highland sits between Airport Boulevard, Lamar and Interstate 35, around the former mall site that has been redeveloped with a community college campus, housing and office blocks. A local provider places standing units for the phased campus work and for smaller brick-house and apartment renovations, and a technician sets each unit to match the phase schedule before the placement is confirmed.

Highland takes in the area around the former Highland Mall, which has been redeveloped with a community college campus and with housing and office blocks around it. The ZIP also covers St. John's and the Capital Plaza area, so one portable-toilet route list reaches both the campus side and the older residential blocks. The housing is small brick houses from the 1950s and 1960s and 1970s apartment courts, with Little Walnut Creek draining the north side.

Two kinds of work set the demand here. The campus and mixed-use redevelopment runs in phases, which means standing units on a set servicing schedule, while the apartment stock produces steady renovation jobs that need one unit for a few weeks at a time. A technician plans the count and the placement around each phase rather than around the building's footprint. The long-term portable toilet rental page explains how a standing unit is booked. Call (888) 351-0294 with the phase dates to start.

City
Highland, TX
County
Travis County
ZIP codes
78752
Hours
Call to reach a local provider

Today in Highland

Local weather drives activity here: heat, humidity and rain change what shows up week to week.

    Call (888) 351-0294

    Coverage

    Where we work in Highland

    Neighborhoods we cover

    • Redeveloped campus and mixed-use blocks
    • 1950s and 1960s small brick houses
    • 1970s apartment courts
    • Office and housing blocks around a former mall site
    • Little Walnut Creek drainage on the north side
    • Airport Boulevard commercial frontage

    Landmarks and main roads

    • Airport Boulevard
    • Lamar
    • Interstate 35
    • Little Walnut Creek
    • Capital Plaza

    How does a phased campus job change the unit count?

    A phased campus job keeps crews and students on site for long stretches, and each new building phase adds a crew and a new set of users. A unit that serves one phase may need to move when the next phase starts, so the count is revisited at each phase rather than set once at the beginning. The phases overlap, which means two sets of crews can need units at the same time.

    The technician asks for the phase dates, the number of people on each phase and the walk from the building to the unit. The walk matters as much as the number, because a unit that sits too far from the work tends to be used less, and a placement is moved if the walk is long. Those three answers set the count for the first phase, and the rest follow the map.

    What does a standing unit need on campus grounds?

    A unit that stands on campus grounds for months needs a level pad, a clear access route for the servicing truck and a placement that stays out of the path of pedestrians. Pedestrian routes have to stay accessible under the city's general rules, so a unit set on a walkway is a problem before it is a placement. The unit is set on the grass, the parking edge or the service yard where the route is clear.

    Servicing is scheduled on a set interval and written into the rental. Handwashing stations are separate, and on a campus they are often placed near the units so users wash up before they leave the building. The schedule is checked at each phase change, and the handwashing supply is checked on the same visit as the cleaning.

    What do the apartment renovations need from the placement?

    Small brick houses and 1970s apartment courts have tight yards and narrow parking lots, so a renovation unit goes on the lot or in the parking area where a truck can stop. Renovation jobs usually run a few weeks, which suits a standard unit that is set once and removed at the end. A technician checks the stopping spot and whether the unit can sit off the parking aisle without blocking a space.

    Drainage matters on the north side, where Little Walnut Creek drains the area. A unit is not set in a low spot where runoff collects, and ground that slopes toward a drain is avoided. The placement is confirmed on the ground itself, not only on the site plan, since a plan does not show where the water runs after a storm.

    How does the waste side work for a phased job?

    Waste from a campus or renovation unit goes to an authorized disposal facility, such as a wastewater treatment plant, a sanitary landfill or an authorized land-application site. Transporters must be registered with the state under the rules in 30 TAC chapter 312, and chemical toilet waste is covered alongside sewage sludge and domestic septage.

    The servicing schedule follows the phase. A unit removed at the end of a phase is picked up on the last day it is needed, and the next unit is placed where the next phase begins. That keeps the number of units on the map equal to the number of crews on the map, and it keeps the waste loads matched to the work that produced them.

    Popular here

    One call and it gets handled.

    Most service in Highland calls are scheduled the same day when a technician is free, and you approve the price before any work starts.

    ZIP check

    Confirm coverage for your Highland address

    Highland ZIP codes we cover: 78752. Type yours to confirm, or just call.

    Nearby

    Also serving areas near Highland

    FAQ

    Highland FAQs

    Will a campus unit need a permit?

    The answer depends on the ground. A unit on private campus land follows the owner's permits for the job, and a unit that sits on a public sidewalk or street follows the city's right-of-way rules. A technician confirms the site before the unit is set.

    How many units does a phased campus job need?

    The count follows the number of people on each phase, the walk from the building and the length of the phase. For construction crews, the federal table sets the minimum by crew size: one facility for 20 or fewer workers, and more than 20 workers need one toilet seat and one urinal per 40 workers.

    Does a unit on a construction site have to be accessible?

    It depends on who uses it. Units the public uses follow the ADA standard, which requires at least one, or five percent, of the units in each cluster to be accessible. A technician confirms who will use the units before the count is set.

    What happens if a unit blocks a walkway near campus?

    A unit that blocks a sidewalk is a right-of-way problem, and the city can have it removed. Pedestrian routes must stay accessible, so a unit that cannot stay where it is gets moved. A technician sets the unit clear of the walkway from the start.

    Who services a unit on a long job?

    A local provider services the unit on a set schedule, and the waste goes to an authorized disposal facility under the state transporter rules. The schedule is written into the rental when it starts and reviewed at each phase change.

    WhatsApp