Storm cleanup and flood-site portable restrooms in Austin, TX

Portable restrooms for flood and storm cleanup sites in Austin, placed for creek access, servicing through the cleanup and the closure rules.

  • Standard units, ADA units and restroom trailers
  • Construction sites, festivals and private events
  • Delivery, servicing and pickup scheduled around your dates

Get a fast quote

Fastest: call (888) 351-0294. Or send this and we call you back.

Storm Cleanup

Storm & Emergency Sanitation: what it covers

Quick answer

Storm cleanup sanitation is the set of portable units and handwashing stations placed on a flooded or storm-damaged property while the cleanup and rebuild go on. Austin's flooding is fast creek flooding, so the placement is chosen above the water line and away from the drainage path, and the schedule runs for as long as the site is in use.

Storm & Emergency Sanitation illustration for Austin, TX

Creek flooding in Austin is fast and local, and it can affect a single lot or a single street. The Halloween 2013 floods damaged homes along Onion and Williamson creeks, and the city later bought out homes in the Onion Creek area. A cleanup site after a flood has no working plumbing and wet ground, and a crew working there needs sanitation in place as the work starts, not after it.

Flood-site sanitation differs from an event. The ground may still be wet, debris or a damaged driveway can block access, and the units are needed for a long run rather than a weekend. The placement goes on high ground where the site allows, the access is checked before the truck is booked, and the schedule follows the crew's hours. Call (888) 351-0294 with the property address, the work under way and the number of people on site, and ask for a placement check.

Service area
Austin & Travis County
Availability
Call to reach a local provider
Warning signs

Signs you need storm & emergency sanitation

Do not enter standing water to set or move a unit, and do not let a truck drive onto a soft lot to reach the placement. Do not place a unit against a damaged wall or under a loose structure. Keep the drainage path clear, and do not build a dam to protect a unit, because diverted water can reach a neighboring property. Waste is handled by the crew only, and any spill, leak or damaged tank is reported to the technician at once.

  • Mud lines on the walls and fences of the damaged property
  • Debris piled at the curb with a clear route left through it
  • A unit set on a firm base above a low spot in the yard
  • Standing water in the drainage path that the crew routes around
  • A handwashing station beside the units with a running water supply
  • Crew members moving tools between the work area and the units
Our process

How our storm & emergency sanitation visit works

  1. Check the ground and the water line

    A technician walks the site and marks the high ground that is still usable. Creek flooding leaves ground soft and water in low spots, and a unit in a low spot can sink, lean or be undermined. The placement goes on the highest level ground that is clear of the damaged structure and the drainage path.

  2. Clear the access

    Debris, a damaged driveway or a fallen fence can block the truck route. The access is checked before the truck is booked, and the crew marks a route the truck can use. Where that route crosses a street or sidewalk, the closure rules apply and notice goes to 311 for a planned closure.

  3. Set the handwashing and the water

    Cleanup crews work with their hands in mud and debris, so a running-water station beside the units is a basic need. Each station has a drying method and a holding tank for its wastewater. The water supply is planned for the heat and the hours of the work, and checked each day.

  4. Set the schedule to the work

    The units run through the cleanup, so servicing follows the crew's shifts and the weather. Flood work runs longer than an event, and visits are planned for the hottest hours and for the days after heavy rain. The crew confirms the end date, which sets the removal date.

  5. Remove the units when the work ends

    When the cleanup and rebuild are finished, the units are emptied, the waste goes to an authorized disposal facility and the ground is left as it was found. Removal is booked at the start, and the route is confirmed with the crew before the day.

Where should a unit go on a flood-damaged lot?

On the highest usable ground that is still clear of the damaged structure and the drainage path, with a firm base and a route for the truck.

A unit on wet ground sinks, leans or tips, and a unit in a drainage path can be carried off or filled with water. The technician looks for high ground that stays firm after rain and clear of the path water takes across the lot.

Because creek flooding is fast and local, the placement is not a one-time choice. After heavy rain the base and level are checked, and the unit is re-leveled if the ground has moved.

How does creek flooding affect the schedule?

Rain and a rising creek change the access and the ground, so the schedule is planned around the weather and checked after each event that brings water onto the site.

A check is added after heavy rain so that a unit that has been flooded or moved is found and set right. The provider and the crew agree visit dates in advance, with room for extra visits when the forecast turns.

The 2013 floods along Onion and Williamson creeks damaged homes, and the city later bought out homes in the Onion Creek area. A site near a creek is planned for that kind of event, not for an average week.

Do cleanup units need a permit?

Permits depend on where the site is and what the work involves. A site inside Austin follows the city's rules, an unincorporated site follows the county's, and any street or sidewalk closure needs the right-of-way notice or permit.

A planned sidewalk, bike lane or alley closure needs notice to 311 at least three days before. Some city pages say three business days, so the current rule is confirmed before the date is set. A temporary use of right-of-way permit is required to close a sidewalk or driveway for work on private property.

Pedestrian routes must stay accessible while the work runs, and a sidewalk should not be closed for more than 14 days without right-of-way division approval. The permitting office confirms what applies to the specific property.

What moves the price for flood-site sanitation?

The number of units, the access, how long the site stays in use, how often the units are serviced and how the placement is reset after rain. The price is explained and approved before work starts.

Access and placement move the price most on a flooded lot. A truck that cannot reach the spot adds a carry or a second drop, and a placement that must be reset after rain adds a visit.

The provider confirms the price for the site before delivery, and you approve it before any work starts. Ask for the schedule and the reset visits in writing. No figure is published on this page.

How is waste handled after a flood?

Waste is taken on a set schedule to an authorized disposal facility and is never drained onto the ground or into a creek.

Portable toilet waste is handled as chemical toilet waste under Texas transporter rules. Disposal is allowed only at authorized facilities, such as wastewater treatment plants, sanitary landfills, Type V facilities or authorized land-application sites. Some receiving plants require their own annual registration and vehicle inspection, so the disposal route is confirmed before work starts.

A flooded site is a poor place to store waste, so the tanks are emptied on the route in the plan, and nothing is left on the lot or in the water path.

Options

Types and options for storm & emergency sanitation

Residential cleanup

Used at a house where water came into the living space while the owner and a crew work through the rooms. Units are placed in the yard on the highest usable ground, with a route that avoids the wettest area. The count is smaller than at a commercial site, but the schedule matters more, because the house may be occupied during the work.

Commercial and street-frontage cleanup

Used at a shop or lot where the work runs for some time and crews come and go through the day. Units sit away from the entrance and the drainage line, and access stays clear for deliveries. If units or work reach the sidewalk or street, the closure rules apply.

Creek-edge and low-lying sites

Used on lots near Onion Creek, Williamson Creek, Boggy Creek or other creeks that cross the city. The placement is set above the expected water line, which the technician identifies from the site and the local record of past flooding. The route to such a site may flood, so access is checked again after rain.

Travis County

Why storm & emergency sanitation is different in Greater Austin and the Travis County line

Austin's creeks run through the city in several directions. Onion Creek and Williamson Creek are the two named in the 2013 floods, and Boggy Creek, Shoal Creek, Waller Creek, Walnut Creek and Bear Creek also cross the city's land. On any of them, the path that matters is the one water takes across the lot, not the one shown on a map.

Creek-flood risk here is year-round rather than seasonal, so placement and scheduling cannot be set for a dry season. A site that is clear in one month can take water after a heavy rain in another, and the ground is checked after each heavy rain in any month.

Heat is the other local condition. The average first day at 100 degrees or more falls around early July by the National Weather Service normals, and in several recent years it came in May or June. A crew working from spring into summer needs the servicing schedule and handwashing supply set for heat from the start, and the placement keeps units out of the wettest and hottest spots.

Need storm & emergency sanitation today?

Call any hour and explain what is going on. You get a clear price before any work starts.

Related

Portable Toilet Delivery & Pickup

How a portable toilet is delivered, placed and picked up in Austin, planned around truck access, ground and right of way.

Handwashing Station Rental

Handwashing stations with running water, placed beside each toilet location and planned against the state rule for mass gatherings.

Construction Site Portable Toilets

Portable toilets for job sites in Austin, counted against the federal OSHA table and placed on firm ground the crew can reach.

FAQ

Storm & Emergency Sanitation FAQs

Can a unit be set on a site that is still wet?

Yes, on the highest usable ground the technician can confirm. A wet site is not a reason to delay placement, but the base is checked before the unit is set and again after the next heavy rain. A unit that sinks or leans is re-leveled rather than left in a poor spot.

How far ahead should I plan a cleanup placement?

As early as the site allows, because the access check and the placement survey take time. The provider confirms what the site can take and the date a unit can be set. The schedule is agreed in advance and reset if the weather or the work changes.

Does a flood site need handwashing stations?

Yes, where the crew works with its hands in mud and debris. A running-water station beside the units is the basic setup, and the water supply is planned for the heat and the hours of the work. The count follows the number of people on site and the work shifts.

What about a unit that sits in the street?

A unit in a street or on a sidewalk is part of a closure, and the closure rules apply. A planned closure needs notice to 311 at least three days before. A unit that blocks a sidewalk can be reported to 311 and removed, so the pedestrian route must stay accessible.

Who confirms the price?

The provider confirms the price for your site before delivery, and the price is explained to you and approved before work starts. Access, the number of units, the length of use and the resets after rain all move it. No figure is given on this page.

Can the placement be moved during the job?

Yes. A unit can be re-set when the ground, the access or the work changes, and each move is booked as a visit. Tell the technician about a change as early as it is known, so the crew can plan the move around the work.